PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
72301819
CONSTRUCTION VALUATION INFO
Intake Value: New:
72301819
Intake Value: Alteration:
0
Total Intake Value:
72301819
Issue Value: New:
64076923
Issue Value: Alteration:
0
Total Issued Value:
64076923
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/04/2018
Permit Issued Date:
10/04/2019
Inspections Completed Date:
09/07/2023
Certificate of Occupancy Issued Date:
09/07/2023
Permit Remarks:
Applicant elects vesting per SMC 23.76.026 C2b.
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
0
Number of Proposed Offsite Parking Spaces:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
SEC C411: PV
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
2
Number of Other New Drainage Connections:
0
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Wetland
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
110977
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
86898
Total Volume Managed by On-Site Stormwater Management (gallons):
356972
Total Area Requiring Soil Amendment:
24079
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
3
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
265
Reuse Existing Side Sewer System:
No