PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
350000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/02/2019
Permit Issued Date:
12/09/2019
Inspections Completed Date:
01/28/2021
Permit Remarks:
West townhouse: changed address to 3667 Interlake Ave N slm 6/05/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
491083
Intake Value: Alteration:
0
Total Intake Value:
491083
Issue Value: New:
491083
Issue Value: Alteration:
0
Total Issued Value:
491083
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
Proposed to utilize an existing alley located on the west of subject property.
PARKING
# of Proposed Onsite Parking:
4
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13R:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
SIDE SEWER INFORMATION
Related New Construction Project:
6718999
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
4118
New Impervious Surface:
1315
New Plus Replaced Impervious Surface:
1978
Total Volume Managed by On-Site Stormwater Management (gallons):
50677
Total Area Requiring Soil Amendment:
825
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
5
Reuse Existing Side Sewer System:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0