PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
05/10/2022
Permit Issued Date:
10/25/2022
Inspections Completed Date:
07/25/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
DEMOLITION INFO
Type of Demolition:
Demolition
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
SKANSUB985RT