PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/06/2021
Permit Issued Date:
08/22/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1000000
Total Intake Value:
1000000
Issue Value: New:
0
Issue Value: Alteration:
1000000
Total Issued Value:
1000000
Total Revision Value:
0
PERMIT APPLICATION COMMON
Where on your property are you working?:
The entire site - exclusive of the building and parking lot
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
4000000
PARKING
# of Existing Onsite Parking:
30
# of Existing Accessible Parking:
2
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
NA
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
4
# of Proposed Bicycle Parking Spots:
4
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
3
Fill Depth in Feet (maximum):
2
Foundation Type:
Other
Does anyone live or work here?:
Yes
Is the disposal site inside the city?:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2018 SEBC
Action Type:
Add/Alt
Will you change the building use or occupancy?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
192432
New Impervious Surface:
5149
New Plus Replaced Impervious Surface:
152109
Total Volume Managed by On-Site Stormwater Management (gallons):
1999243
Total Area Requiring Soil Amendment:
40323
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Authorized Government Representative
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes