PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/23/2019
Permit Issued Date:
04/15/2021
Inspections Completed Date:
09/13/2022
Certificate of Occupancy Issued Date:
09/13/2022
CONSTRUCTION VALUATION INFO
Intake Value: New:
3273961
Intake Value: Alteration:
0
Total Intake Value:
3273961
Issue Value: New:
3842334
Issue Value: Alteration:
0
Total Issued Value:
3842334
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
4
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
0
# of Proposed Bicycle Parking Spots:
84
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Resistance
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
Special Requirements:
Green DR 20-2017, 79% of baseline. PV on roof,
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
11571
New Impervious Surface:
4516
New Plus Replaced Impervious Surface:
9048
Total Volume Managed by On-Site Stormwater Management (gallons):
60904
Total Area Requiring Soil Amendment:
2523
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
SANITARY INFORMATION
Number of New Connections to the Side Sewer:
1