PERMIT APPLICATION COMMON
Where on your property are you working?:
FIRST FLOOR COMMERCIAL TENANT SPACE
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
150000.00
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/09/2019
Permit Issued Date:
07/12/2019
Inspections Completed Date:
12/21/2020
Certificate of Occupancy Issued Date:
12/21/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
150000
Total Intake Value:
150000
Issue Value: New:
150000
Issue Value: Alteration:
0
Total Issued Value:
150000
Initial TI Shell and Core:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
6
Number of Existing Below-Grade Building Stories:
2
Number of Proposed Building Stories:
6
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Partial Fire Protection System:
Yes
Fire Alarm:
Yes
Other Fire Protection System:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
Yes
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
type one kitchen range hood
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown