PERMIT APPLICATION COMMON
Where on your property are you working?:
in the build-able area of the lot
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
600000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
05/31/2019
Permit Issued Date:
10/03/2019
Inspections Completed Date:
08/13/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
600000
Intake Value: Alteration:
0
Total Intake Value:
600000
Issue Value: New:
600000
Issue Value: Alteration:
0
Total Issued Value:
600000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Existing Building Stories:
1
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Existing Occupancy:
R-3 Single Family Dwelling
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
4
Fill Depth in Feet (maximum):
4
Foundation Type:
Other
Does anyone live or work here?:
No
Is the disposal site inside the city?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To construct and maintain a 10 foot wide driveway on 9th Ave NW approximately 12 feet south of the north property line.
PARKING
# of Existing Onsite Parking:
1
# of Proposed Onsite Parking:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
Other Type of Sprinkler System:
NA
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
On Site
Total Disturbed Area:
5400
New Impervious Surface:
950
New Plus Replaced Impervious Surface:
2193
Total Volume Managed by On-Site Stormwater Management (gallons):
2193
Total Area Requiring Soil Amendment:
3207
SANITARY INFORMATION
Sanitary Type of Work:
Addition/Alteration
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1