PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
150000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/14/2019
Permit Issued Date:
02/10/2020
Inspections Completed Date:
12/14/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
378766
Intake Value: Alteration:
78950
Total Intake Value:
457716
Issue Value: New:
378766
Issue Value: Alteration:
78950
Total Issued Value:
457716
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
Yes
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
none
PARKING
# of Proposed Onsite Parking:
0
Offsite Parking Location:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Commercial
Compliance Path:
Component Performance
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
solar ready roof
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Cooling Fuel Type Proposed: Non-Residential:
Unknown
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
3234
New Impervious Surface:
1300
New Plus Replaced Impervious Surface:
3091
Total Volume Managed by On-Site Stormwater Management (gallons):
7232
Total Area Requiring Soil Amendment:
143
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
Addition/Alteration
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
No