PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
150000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/11/2019
Permit Issued Date:
09/03/2019
Inspections Completed Date:
07/07/2020
Permit Remarks:
DADU removed from scope of work
CONSTRUCTION VALUATION INFO
Intake Value: New:
543302
Intake Value: Alteration:
0
Total Intake Value:
543302
Issue Value: New:
413269
Issue Value: Alteration:
0
Total Issued Value:
413269
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To construct and maintain one 10 foot wide curbcut along 19th Avenue East approximately 5 feet south of the north property line.
PARKING
# of Existing Onsite Parking:
1
# of Proposed Onsite Parking:
1
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
Special Requirements:
solar ready
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
4501
New Impervious Surface:
1403
New Plus Replaced Impervious Surface:
2792
Total Volume Managed by On-Site Stormwater Management (gallons):
24927
Total Area Requiring Soil Amendment:
1709
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Number of New Dwelling Units:
2
Reuse Existing Side Sewer System:
Yes