PERMIT APPLICATION COMMON
Where on your property are you working?:
Inside the existing, ground-level commercial/industrial space.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Industrial
Project Value:
300000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
09/03/2019
Permit Issued Date:
03/12/2020
Inspections Completed Date:
08/14/2024
Certificate of Occupancy Issued Date:
08/14/2024
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
300000
Total Intake Value:
300000
Issue Value: New:
0
Issue Value: Alteration:
300000
Total Issued Value:
300000
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Storage
Existing Occupancy:
S-1 Storage - Moderate Hazard
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
13
# of Existing Accessible Parking:
1
# of Proposed Onsite Parking:
20
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
4
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Component Performance
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
mechanical under separate permits
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
C406.2 & C406.6/A600