PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
800000
PERMIT TRACKING COMMON
Review Level:
Dependent Building
Application Completed Date:
10/25/2019
Permit Issued Date:
11/06/2019
Inspections Completed Date:
11/16/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
467680
Intake Value: Alteration:
0
Total Intake Value:
467680
Issue Value: New:
519397
Issue Value: Alteration:
0
Total Issued Value:
519397
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
2
Fill Depth in Feet (maximum):
2
Foundation Type:
Spread Footing
Does anyone live or work here?:
Yes
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No