PERMIT APPLICATION COMMON
Where on your property are you working?:
Buildable area on the lot holding the plan to align with the north property setback
- One 12" Cherry tree and one 16" Douglas fir located on the southwest corner of subject parcel near an existing alley for TP and TPA signs.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
450000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
03/29/2019
Permit Issued Date:
07/24/2019
Inspections Completed Date:
09/08/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
619498
Intake Value: Alteration:
0
Total Intake Value:
619498
Issue Value: New:
619498
Issue Value: Alteration:
0
Total Issued Value:
619498
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Existing Building Stories:
1
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Existing Occupancy:
R-3 Single Family Dwelling
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
3
Fill Depth in Feet (maximum):
2
Foundation Type:
Spread Footing
Does anyone live or work here?:
No
Is the disposal site inside the city?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
At alley edge on the Northwest portion of the lot
PARKING
# of Existing Onsite Parking:
1
# of Proposed Onsite Parking:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
TBD
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Ditch
Total Disturbed Area:
6984
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
3713
Total Volume Managed by On-Site Stormwater Management (gallons):
50956
Total Area Requiring Soil Amendment:
2606
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes