PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/22/2020
Permit Issued Date:
11/12/2020
Inspections Completed Date:
10/27/2022
Certificate of Occupancy Issued Date:
10/27/2022
CONSTRUCTION VALUATION INFO
Intake Value: New:
6211294
Intake Value: Alteration:
0
Total Intake Value:
6211294
Issue Value: New:
6211294
Issue Value: Alteration:
0
Total Issued Value:
6211294
Total Revision Value:
0
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
PARKING
# of Proposed Onsite Parking:
1
# of Proposed Bicycle Parking Spots:
90
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
C406: C406.3 & C406.9/G000,
C411 ok per dwg. A209
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
8023
New Impervious Surface:
2385
New Plus Replaced Impervious Surface:
7035
Total Volume Managed by On-Site Stormwater Management (gallons):
47022
Total Area Requiring Soil Amendment:
988
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Reuse Existing Side Sewer System:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
CONSTBI982J5