PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
05/08/2019
Permit Issued Date:
06/02/2020
Inspections Completed Date:
09/09/2022
Permit Remarks:
Curb Cut on E. John Street to be removed.
CONSTRUCTION VALUATION INFO
Intake Value: New:
500374
Intake Value: Alteration:
0
Total Intake Value:
500374
Issue Value: New:
485546
Issue Value: Alteration:
0
Total Issued Value:
485546
PERMIT APPLICATION COMMON
Where on your property are you working?:
The front half towards 29th Ave, where the exist house will be demolished.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
300000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
Curb Cut on E. John Street to be removed.
PARKING
# of Existing Onsite Parking:
1
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
1
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
5
Fill Depth in Feet (maximum):
5
Foundation Type:
Basement
Does anyone live or work here?:
No
Is the disposal site inside the city?:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
New
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Will your application include a new standard plan?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
radient floor water heating
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
SIDE SEWER INFORMATION
Related New Construction Project:
6702252
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Discharge Point Other Type:
(E John St)
Total Disturbed Area:
4800
New Impervious Surface:
200
New Plus Replaced Impervious Surface:
1900
Total Volume Managed by On-Site Stormwater Management (gallons):
28100
Total Area Requiring Soil Amendment:
2700
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes