PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
600000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/28/2019
Permit Issued Date:
02/12/2020
Inspections Completed Date:
06/10/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
566762
Intake Value: Alteration:
0
Total Intake Value:
566762
Issue Value: New:
566762
Issue Value: Alteration:
0
Total Issued Value:
566762
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To construct and maintain on standard residential curb cut 10' wide to be located along 26th Ave E approximately 10 from southern property line. Existing curb cut to be removed and replaced to SDOT standards.
PARKING
# of Proposed Onsite Parking:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
95
Heating Fuel Type Proposed: Residential:
Natural Gas
Data Center Building?:
No
Power is Sub-Metered?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
Basic
Discharge Point:
Combined System
Total Disturbed Area:
4500
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
2346
Total Volume Managed by On-Site Stormwater Management (gallons):
20441
Total Area Requiring Soil Amendment:
2154
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes