PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
02/19/2019
Permit Issued Date:
02/07/2020
Inspections Completed Date:
10/26/2022
Certificate of Occupancy Issued Date:
10/26/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
7363624
Intake Value: Alteration:
0
Total Intake Value:
7363624
Issue Value: New:
7363624
Issue Value: Alteration:
0
Total Issued Value:
7363624
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
6497138
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
na
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
PARKING
# of Proposed Onsite Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Emergency Generator:
Yes
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Total UA Alternative
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Special Requirements:
PV on roof.
Power is Sub-Metered?:
Yes
SIDE SEWER INFORMATION
Related New Construction Project:
6696273
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
9256
New Impervious Surface:
1332
New Plus Replaced Impervious Surface:
8415
Total Volume Managed by On-Site Stormwater Management (gallons):
37569
Total Area Requiring Soil Amendment:
841
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
79
Reuse Existing Side Sewer System:
Yes