PERMIT APPLICATION COMMON
Where on your property are you working?:
WEST TOWNHOUSE
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
444991
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/26/2018
Permit Issued Date:
11/09/2018
Inspections Completed Date:
12/19/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
444991
Intake Value: Alteration:
0
Total Intake Value:
444991
Issue Value: New:
444991
Issue Value: Alteration:
0
Total Issued Value:
444991
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Will you change the building use or occupancy?:
Yes
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Excavation:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
5304
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
4304
Total Volume Managed by On-Site Stormwater Management (gallons):
36894
Total Area Requiring Soil Amendment:
1000
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Reuse Existing Side Sewer System:
No