PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/11/2018
Permit Issued Date:
08/25/2020
Inspections Completed Date:
11/12/2021
Permit Remarks:
3/4/2021 RC - CHANGED ADDRESS FROM 8445 TO 8445B DELRIDGE WAY SW
CONSTRUCTION VALUATION INFO
Intake Value: New:
439799
Intake Value: Alteration:
0
Total Intake Value:
439799
Issue Value: New:
439799
Issue Value: Alteration:
0
Total Issued Value:
439799
Total Revision Value:
0
PERMIT APPLICATION COMMON
Where on your property are you working?:
New Building to west of existing SFR, between SFR and Alley
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
300000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
Foundation Type:
Spread Footing
PARKING
# of Existing Onsite Parking:
1
# of Proposed Onsite Parking:
2
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
SIDE SEWER INFORMATION
Related New Construction Project:
6694947
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
On Site
Total Disturbed Area:
5012
New Impervious Surface:
2277
New Plus Replaced Impervious Surface:
2277
Total Volume Managed by On-Site Stormwater Management (gallons):
43811
Total Area Requiring Soil Amendment:
419
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
2
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee