PERMIT APPLICATION COMMON
Where on your property are you working?:
We are doing work on the entire property
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
264000000
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
458767965
Total Intake Value:
458767965
Issue Value: New:
73467900
Issue Value: Alteration:
385300065
Total Issued Value:
458767965
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
3
Number of Existing Below-Grade Building Stories:
3
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
4
Number of Mezzanines:
1
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Assembly
Existing Occupancy:
A-4 Arena
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
56
Fill Depth in Feet (maximum):
0
Foundation Type:
Other
Does anyone live or work here?:
No
Is the disposal site inside the city?:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/06/2018
Permit Issued Date:
08/05/2019
Inspections Completed Date:
04/01/2022
Certificate of Occupancy Issued Date:
04/01/2022
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Curb Cut Size and Location:
15-foot curbcut along 1st Ave N for maintenance purposes only directly north of the 1st Ave N and Harrison St intersection. Second curbcut is 22-feet for the main entrance and that is located just east of the Thomas St and Warren Ave N intersection.
PARKING
Number of Existing Onsite Parking Spaces:
50
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
5
Number of Proposed Onsite Parking Spaces:
450
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
N/A
Number of Proposed Accessible Parking Spaces:
10
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
236
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
No
Exit and Pathway Lighting:
No
Stairway Pressurization:
Yes
Smoke Removal System:
Yes
Emergency Generator:
Yes
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Natural Gas
Cooling Fuel Type Proposed: Non-Residential:
Electric Resistance
Special Requirements:
C407 Reduced lighting credits are as follows,
Exterior lighting design is 12,419 watts. Parking garage design 11,597 watts, Façade lighting design 1,668 watts. Interior lighting design arena 0.35 W/sf., locker rooms 0.54 W/sf., Suites clubs bars 0.77 W/sf., concessions 0.71 W/sf. corridors 0.48 W/sf. restrooms 0.7 W/sf.
SIDE SEWER INFORMATION
Related New Construction Project:
6694765
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
Addition/Alteration
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
2
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
346632
New Impervious Surface:
181392
New Plus Replaced Impervious Surface:
0
Total Volume Managed by On-Site Stormwater Management (gallons):
31739
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
6
Sanitary Type of Work:
Addition/Alteration
Number of New Sewer Connections to the Main:
2
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes