PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
04/24/2019
Permit Issued Date:
08/27/2019
Inspections Completed Date:
02/23/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
225000
Total Intake Value:
225000
Issue Value: New:
0
Issue Value: Alteration:
225000
Total Issued Value:
225000
PERMIT APPLICATION COMMON
Where on your property are you working?:
The wall, sign, and paving will be located at the front of the property along East Marginal Way. The gate is located on the south edge of the property. With the exception of paving, all construction activities will occur only on the Cadman parcel and not in a right-of-way or alley. The paving will extend into the public right-of-way of East Marginal Way.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Industrial
Project Value:
225000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
N/A
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
Add/Alt
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
295387
New Impervious Surface:
3554
New Plus Replaced Impervious Surface:
3554
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Sanitary Type of Work:
None
Reuse Existing Side Sewer System:
Yes