PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
10/15/2018
Permit Issued Date:
06/17/2019
Inspections Completed Date:
05/20/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
605714
Intake Value: Alteration:
0
Total Intake Value:
605714
Issue Value: New:
639564
Issue Value: Alteration:
0
Total Issued Value:
639564
PERMIT APPLICATION COMMON
Where on your property are you working?:
Lot A of 3033061-LU
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
605714
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
Construct & maintain (1) 10' wide curb cut along nw 51st st.
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
Cooling Fuel Type Proposed: Residential:
Unknown
SIDE SEWER INFORMATION
Related New Construction Project:
6692054
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Formerly Combined
Total Disturbed Area:
3400
New Impervious Surface:
1565
New Plus Replaced Impervious Surface:
1597
Total Volume Managed by On-Site Stormwater Management (gallons):
34285
Total Area Requiring Soil Amendment:
238
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
2
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of New Dwelling Units:
3
Reuse Existing Side Sewer System:
No