PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
01/15/2019
Permit Issued Date:
04/25/2019
Inspections Completed Date:
03/10/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1000000
Total Intake Value:
1000000
Issue Value: New:
0
Issue Value: Alteration:
1000000
Total Issued Value:
1000000
PERMIT APPLICATION COMMON
Where on your property are you working?:
Work includes the removal and disposal of existing cladding, vinyl fenestration, unit balcony rails and coatings, with associated revisions at the perimeter of the existing low slope roof membrane. Targeted upgrades to enclosure include clad exterior walls (water/air membrane, FRC panel cladding, and sealants) unit balcony coatings and rail system, vinyl windows and vinyl doors.
No changes proposed to structure.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1000000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
N/A
# of Proposed Accessible Parking:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
Is your development site in an environmentally critical area (ECA)?:
No
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Existing Occupancy:
R-2 Apartment/Condominium
Will your application include a new standard plan?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
None.
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Cooling Fuel Type Proposed: Residential:
Unknown