PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
02/05/2019
Permit Issued Date:
12/04/2020
Inspections Completed Date:
09/19/2022
Permit Remarks:
One new 10-ft curb cut on Whitman Ave N. See site plan.
CONSTRUCTION VALUATION INFO
Intake Value: New:
1136995
Intake Value: Alteration:
0
Total Intake Value:
1136995
Issue Value: New:
1136995
Issue Value: Alteration:
0
Total Issued Value:
1136995
PERMIT APPLICATION COMMON
Where on your property are you working?:
THE ENTIRE PROPERTY WILL BE AFFECTED BY THE PROJECT SCOPE
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
1250000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
One new 10-ft curb cut on Whitman Ave N. See site plan.
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
8
Fill Depth in Feet (maximum):
2
Foundation Type:
Basement
Does anyone live or work here?:
Yes
Is the disposal site inside the city?:
No
PARKING
# of Proposed Onsite Parking:
7
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
5000
New Impervious Surface:
2988
New Plus Replaced Impervious Surface:
4172
Total Volume Managed by On-Site Stormwater Management (gallons):
48556
Total Area Requiring Soil Amendment:
828
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
7
Reuse Existing Side Sewer System:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee