PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/22/2019
Permit Issued Date:
07/19/2019
Inspections Completed Date:
12/16/2021
Certificate of Occupancy Issued Date:
12/16/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
3921064
Intake Value: Alteration:
0
Total Intake Value:
3921064
Issue Value: New:
3921064
Issue Value: Alteration:
0
Total Issued Value:
3921064
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
New and Replaced Hard Surface > 750 sq ft?:
No
Fill Depth in Feet (maximum):
10
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
4000000
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
SEC C411: PV
SIDE SEWER INFORMATION
Related New Construction Project:
6691698
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Former Combined
Total Disturbed Area:
4275
New Impervious Surface:
437
New Plus Replaced Impervious Surface:
3710
Total Volume Managed by On-Site Stormwater Management (gallons):
13159
Total Area Requiring Soil Amendment:
565
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Number of New Dwelling Units:
67
Reuse Existing Side Sewer System:
Yes