PERMIT APPLICATION COMMON
Where on your property are you working?:
South end of the campus for the gym, North end of campus for the surface parking lot.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
14019144
CONSTRUCTION VALUATION INFO
Intake Value: New:
14019144
Intake Value: Alteration:
5000
Total Intake Value:
14024144
Issue Value: New:
14531805
Issue Value: Alteration:
5000
Total Issued Value:
14536805
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
1
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
5
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Assembly
Existing Occupancy:
A-3 Gymnasium
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is the ground disturbance in an environmentally critical area?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
52
Fill Depth in Feet (maximum):
0
Foundation Type:
Spread Footing
Does anyone live or work here?:
Yes
Is the disposal site inside the city?:
No
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/24/2018
Permit Issued Date:
06/14/2019
Inspections Completed Date:
02/03/2021
Certificate of Occupancy Issued Date:
02/03/2021
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
Number of Existing Onsite Parking Spaces:
39
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
2
Number of Proposed Onsite Parking Spaces:
301
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
N/A
Number of Proposed Accessible Parking Spaces:
9
Number of Existing Bicycle Parking Spots:
5
Number of Proposed Bicycle Parking Spots:
20
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total UA Alternative
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Natural Gas
Cooling Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
Solar readiness on roof. onsite renewable on roof
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
1
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
2
Number of Other New Drainage Connections:
0
Flow Control Type:
Pipe
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Discharge Point Other Type:
Storm in Combined Sewer Area
Total Disturbed Area:
24841
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
24241
Total Volume Managed by On-Site Stormwater Management (gallons):
43494
Total Area Requiring Soil Amendment:
600
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
Yes