PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/30/2019
Permit Issued Date:
01/02/2020
Inspections Completed Date:
06/29/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1500000
Total Intake Value:
1500000
Issue Value: New:
0
Issue Value: Alteration:
1500000
Total Issued Value:
1500000
PERMIT APPLICATION COMMON
Where on your property are you working?:
Perimeter of property. 11th and Howe St.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
1500000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
na
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
New and Replaced Hard Surface > 750 sq ft?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
Does anyone live or work here?:
No
Is the disposal site inside the city?:
No
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
FIRE PROTECTION SYSTEMS
Partial Fire Protection System:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
None
SANITARY INFORMATION
Sanitary Type of Work:
None