PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
11/09/2018
Permit Issued Date:
05/28/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
400000
Total Intake Value:
400000
Issue Value: New:
400000
Issue Value: Alteration:
0
Total Issued Value:
400000
Total Revision Value:
0
PERMIT APPLICATION COMMON
Where on your property are you working?:
Work will be conducted through-out property area - from east to west and from alley @ south up to street @ north.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Vacant Land
Project Value:
400000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
n/a
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
4
Fill Depth in Feet (maximum):
6
Foundation Type:
Other
Does anyone live or work here?:
No
Is the disposal site inside the city?:
Yes
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
Add/Alt
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6689841
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
Addition/Alteration
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Alley
Total Disturbed Area:
14797
New Impervious Surface:
2422
New Plus Replaced Impervious Surface:
4745
Total Volume Managed by On-Site Stormwater Management (gallons):
17037
Total Area Requiring Soil Amendment:
6920
SANITARY INFORMATION
Sanitary Type of Work:
None