PERMIT TRACKING COMMON
Review Level:
Dependent Building
Application Completed Date:
09/17/2018
Permit Issued Date:
05/29/2019
Inspections Completed Date:
11/04/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
194988
Intake Value: Alteration:
0
Total Intake Value:
194988
Issue Value: New:
194988
Issue Value: Alteration:
0
Total Issued Value:
194988
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
161841
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
2
Fill Depth in Feet (maximum):
2
Foundation Type:
Spread Footing
Does anyone live or work here?:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No