PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/19/2018
Permit Issued Date:
08/30/2019
Inspections Completed Date:
02/22/2023
Certificate of Occupancy Issued Date:
02/22/2023
Permit Remarks:
All units, A, B, C, D, E, and F conditions of revision approval, SFD final until 12/21/2021.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
878857
Intake Value: Alteration:
0
Total Intake Value:
878857
Issue Value: New:
1034593
Issue Value: Alteration:
0
Total Issued Value:
1034593
PERMIT APPLICATION COMMON
Where on your property are you working?:
On the entire site.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
878857
PARKING
# of Existing Onsite Parking:
0
# of Proposed Onsite Parking:
3
# of Proposed Bicycle Parking Spots:
6
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
One curb cut along 10th with 5' of it on subject lot and 5' on lot to north (straddling north lot line). Existing in excess of 10' total width to be removed and planting strip restored to SDOT standards.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
5
Fill Depth in Feet (maximum):
5
Foundation Type:
Spread Footing
Does anyone live or work here?:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Does your project qualify for our Priority Green Incentive program?:
Expedited
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
6180
New Impervious Surface:
1550
New Plus Replaced Impervious Surface:
5212
Total Volume Managed by On-Site Stormwater Management (gallons):
31337
Total Area Requiring Soil Amendment:
843
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
6
Reuse Existing Side Sewer System:
No