PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/17/2018
Permit Issued Date:
03/25/2020
Inspections Completed Date:
12/03/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
803165
Intake Value: Alteration:
0
Total Intake Value:
803165
Issue Value: New:
810649
Issue Value: Alteration:
0
Total Issued Value:
810649
PERMIT APPLICATION COMMON
Where on your property are you working?:
THE ENTIRE SITE WILL BE AFFECTED WITH THE SCOPE OF WORK
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1000000
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
3
Fill Depth in Feet (maximum):
2
Foundation Type:
Spread Footing
Does anyone live or work here?:
Yes
Is the disposal site inside the city?:
No
PARKING
# of Existing Onsite Parking:
1
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
5
# of Proposed Offsite Parking:
0
Offsite Parking Location:
none
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
5
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
Pipe
Flow Control Standard:
Pasture
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
4885
New Impervious Surface:
2132
New Plus Replaced Impervious Surface:
3796
Total Volume Managed by On-Site Stormwater Management (gallons):
39183
Total Area Requiring Soil Amendment:
1089
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
5
Reuse Existing Side Sewer System:
No