PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
300722
PERMIT TRACKING COMMON
Review Level:
Dependent Building
Application Completed Date:
01/11/2019
Permit Issued Date:
01/25/2019
Inspections Completed Date:
04/16/2024
CONSTRUCTION VALUATION INFO
Intake Value: New:
300722
Intake Value: Alteration:
0
Total Intake Value:
300722
Issue Value: New:
300722
Issue Value: Alteration:
0
Total Issued Value:
300722
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
Yes
Other Type of Sprinkler System:
13 Dwelling
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SANITARY INFORMATION
Reuse Existing Side Sewer System:
Yes
GROUND DISTURBANCE
New and Replaced Hard Surface > 750 sq ft?:
Yes
PARKING
Number of Proposed Onsite Parking Spaces:
4
Number of Proposed Bicycle Parking Spots:
6
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
4800
New Impervious Surface:
1860
New Plus Replaced Impervious Surface:
4074
Total Volume Managed by On-Site Stormwater Management (gallons):
38880
Total Area Requiring Soil Amendment:
726
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
6