PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/10/2019
Permit Issued Date:
06/04/2020
Inspections Completed Date:
05/24/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
856766
Intake Value: Alteration:
0
Total Intake Value:
856766
Issue Value: New:
856766
Issue Value: Alteration:
0
Total Issued Value:
856766
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
856766
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
PARKING
# of Proposed Onsite Parking:
2
# of Proposed Offsite Parking:
3
Offsite Parking Location:
Two directly to the south and one directly to the east.
# of Proposed Bicycle Parking Spots:
7
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
7724
New Impervious Surface:
3590
New Plus Replaced Impervious Surface:
5851
Total Volume Managed by On-Site Stormwater Management (gallons):
57751
Total Area Requiring Soil Amendment:
1873
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Number of New Dwelling Units:
5
Reuse Existing Side Sewer System:
No