PERMIT APPLICATION COMMON
Where on your property are you working?:
Onsite
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
42000000.00
CONSTRUCTION VALUATION INFO
Intake Value: New:
48423240
Intake Value: Alteration:
0
Total Intake Value:
48423240
Issue Value: New:
43830449
Issue Value: Alteration:
0
Total Issued Value:
43830449
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
8
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
0
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
Other B Occupancy
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
20
Fill Depth in Feet (maximum):
0
Foundation Type:
Spread Footing
Does anyone live or work here?:
No
Is the disposal site inside the city?:
No
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/23/2018
Permit Issued Date:
11/20/2019
Inspections Completed Date:
08/27/2021
Certificate of Occupancy Issued Date:
08/27/2021
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
TBD
PARKING
Number of Existing Onsite Parking Spaces:
46
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
53
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
0
Number of Proposed Accessible Parking Spaces:
0
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
Mechanical System Scope:
shell and core
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Other
Cooling Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
PV system of 91.1 KW total on roof. Project complies with Directors Rule 20-2017 green building energy requirements thru C407 analysis with 2 C406 requirements.
Data Center Building?:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
29731
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
28416
Total Volume Managed by On-Site Stormwater Management (gallons):
159725
Total Area Requiring Soil Amendment:
1315
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No