PERMIT APPLICATION COMMON
Where on your property are you working?:
A PORTION OF THE SECOND FLOOR OF AN EXISTING 11 STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE THE REMOVAL OF (1) DOOR AND MINOR ADJUSTMENTS TO (2) OTHER DOORS.
THE AREA OF WORK IS APPROXIMATELY 100 SF.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
25000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
08/06/2018
Permit Issued Date:
08/06/2018
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
25000
Total Intake Value:
25000
Issue Value: New:
0
Issue Value: Alteration:
25000
Total Issued Value:
25000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
11
Number of Existing Below-Grade Building Stories:
5
Number of Proposed Building Stories:
11
Number of Proposed Below-Grade Building Stories:
5
Number of Mezzanines:
0
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
N/A
PARKING
# of Existing Onsite Parking:
496
# of Existing Offsite Parking:
0
# of Proposed Onsite Parking:
496
# of Proposed Offsite Parking:
0
Offsite Parking Location:
N/A
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
Other Type of Sprinkler System:
-
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
N/A
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
N/A