PERMIT APPLICATION COMMON
Where on your property are you working?:
the 7th floor
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
2000000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/03/2018
Permit Issued Date:
03/01/2019
Inspections Completed Date:
05/08/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
500000
Total Intake Value:
500000
Issue Value: New:
0
Issue Value: Alteration:
500000
Total Issued Value:
500000
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
7
Number of Existing Below-Grade Building Stories:
4
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
4
Number of Mezzanines:
0
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
B Clinic - Outpatient
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
na
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Fire Alarm:
Yes
EMERGENCY SYSTEMS
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
alterations to existing HVAC ductwork