PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/01/2020
Permit Issued Date:
05/26/2022
Inspections Completed Date:
04/09/2025
Certificate of Occupancy Issued Date:
04/09/2025
Permit Remarks:
10/9/2020 RC - EXISTING NORTH RESIDENTIAL ENTRY ADDRESS: 519 N BOWDOIN PL; NEW SOUTH RESIDENTIAL ENTRY ADDRESS: 520 N 39TH ST (Please see activities)
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
2111059
Intake Value: Alteration:
688576
Total Intake Value:
2799635
Issue Value: New:
2799635
Issue Value: Alteration:
331480
Total Issued Value:
3131115
Total Revision Value:
0
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT SIP PM:
JKeenan-Koch
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
5
Number of Proposed Below-Grade Building Stories:
3
Number of Mezzanines:
0
Is this a high-rise?:
No
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
15' curb cut on N Bowdoin Pl
PARKING
# of Proposed Onsite Parking:
2
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
0
# of Proposed Bicycle Parking Spots:
31
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
Heating Fuel Type Proposed: Non-Residential:
Electric Resistance
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
96% hot water heater
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
4831
New Impervious Surface:
3892
New Plus Replaced Impervious Surface:
3892
Total Volume Managed by On-Site Stormwater Management (gallons):
31352
Total Area Requiring Soil Amendment:
939
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
2
Number of New Dwelling Units:
27
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
STRINCH897PU