PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
997338
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
08/24/2018
Permit Issued Date:
01/31/2019
Inspections Completed Date:
03/11/2020
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
997338
Intake Value: Alteration:
0
Total Intake Value:
997338
Issue Value: New:
997338
Issue Value: Alteration:
0
Total Issued Value:
997338
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT Permit Accepted:
Yes
SDOT SIP PM:
Anderson Arifin
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
One standard residential curbcut 10 feet wide, to be located along 13th Ave S approx. 5 feet 6 inches north of the south property line.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
6674848
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Built-as Combined
Total Disturbed Area:
5190
New Impervious Surface:
1470
New Plus Replaced Impervious Surface:
4441
Total Volume Managed by On-Site Stormwater Management (gallons):
36468
Total Area Requiring Soil Amendment:
749
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of New Dwelling Units:
6
Reuse Existing Side Sewer System:
Yes