PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1178478
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/23/2018
Permit Issued Date:
05/31/2019
Inspections Completed Date:
10/09/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
1178478
Intake Value: Alteration:
0
Total Intake Value:
1178478
Issue Value: New:
1178478
Issue Value: Alteration:
0
Total Issued Value:
1178478
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
SIDE SEWER INFORMATION
Related New Construction Project:
6673530
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
6380
New Impervious Surface:
2885
New Plus Replaced Impervious Surface:
4253
Total Volume Managed by On-Site Stormwater Management (gallons):
38959
Total Area Requiring Soil Amendment:
2127
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
5
Reuse Existing Side Sewer System:
Yes