PERMIT APPLICATION COMMON
Where on your property are you working?:
8/17/18:A.M.:CHANGED ADDRESS FROM 2509 E UNION ST TO 2505 E UNION ST
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
320952
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/28/2018
Permit Issued Date:
10/22/2020
Inspections Completed Date:
01/09/2023
CONSTRUCTION VALUATION INFO
Intake Value: New:
320952
Intake Value: Alteration:
0
Total Intake Value:
320952
Issue Value: New:
835203
Issue Value: Alteration:
0
Total Issued Value:
835203
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To propose 10' curb cut approx. 70' east of west property line
PARKING
# of Existing Onsite Parking:
0
# of Proposed Onsite Parking:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
Yes
Pipe Lining in the Right-of-Way:
Yes
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
6595
New Impervious Surface:
2800
New Plus Replaced Impervious Surface:
5610
Total Volume Managed by On-Site Stormwater Management (gallons):
58047
Total Area Requiring Soil Amendment:
985
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
7
Reuse Existing Side Sewer System:
Yes