PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
6000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/11/2018
Permit Issued Date:
04/08/2019
Permit Remarks:
15-foot wide curbcut located approximately 35-feet east of the SW property corner. 16-foot wide curbcut located approximately 125-feet north of the SW property corner. Both with 2.5-foot flares.
CONSTRUCTION VALUATION INFO
Intake Value: New:
6000000
Intake Value: Alteration:
0
Total Intake Value:
6000000
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Curb Cut Size and Location:
15-foot wide curbcut located approximately 35-feet east of the SW property corner. 16-foot wide curbcut located approximately 125-feet north of the SW property corner. Both with 2.5-foot flares.
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
building is not heated/conditioned.
SIDE SEWER INFORMATION
Related New Construction Project:
6670093
Temporary Dewatering for Construction:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
3
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
24980
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
5576
Total Volume Managed by On-Site Stormwater Management (gallons):
23201
Total Area Requiring Soil Amendment:
19404
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
3
Sanitary Type of Work:
Capping Only
Reuse Existing Side Sewer System:
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes