PERMIT APPLICATION COMMON
Where on your property are you working?:
Address changed from 162 to 162B 22nd Ave - West townhouse bldg.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
190730
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/06/2018
Permit Issued Date:
07/25/2019
Inspections Completed Date:
10/15/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
190730
Intake Value: Alteration:
0
Total Intake Value:
190730
Issue Value: New:
505798
Issue Value: Alteration:
0
Total Issued Value:
505798
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
4200
New Impervious Surface:
2051
New Plus Replaced Impervious Surface:
3612
Total Volume Managed by On-Site Stormwater Management (gallons):
33929
Total Area Requiring Soil Amendment:
588
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
2
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
4
Reuse Existing Side Sewer System:
No