PERMIT APPLICATION COMMON
Where on your property are you working?:
8/14/18 SAC Address chngd frm 9500 Interlake Ave to 1400 N 95th ST
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
10009450
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/21/2018
Permit Issued Date:
10/08/2019
Inspections Completed Date:
03/25/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
1009450
Intake Value: Alteration:
0
Total Intake Value:
1009450
Issue Value: New:
1009450
Issue Value: Alteration:
0
Total Issued Value:
1009450
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Does anyone live or work here?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
One 10' wide curb cut along Interlake Ave N located 5' south of north property line.
PARKING
# of Proposed Onsite Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
8
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
SIDE SEWER INFORMATION
Related New Construction Project:
6668973
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
5017
New Impervious Surface:
700
New Plus Replaced Impervious Surface:
3790
Total Volume Managed by On-Site Stormwater Management (gallons):
57548
Total Area Requiring Soil Amendment:
1227
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
6
Reuse Existing Side Sewer System:
Yes