PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
16000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/17/2018
Permit Issued Date:
01/04/2019
Permit Remarks:
Deferred Groundwater Dewatering Plan submitted through a post-submittal revision required prior to First Ground Disturbance.
CONSTRUCTION VALUATION INFO
Intake Value: New:
16000000
Intake Value: Alteration:
0
Total Intake Value:
16000000
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6667504
Temporary Dewatering for Construction:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Combined Sewer Overflow Line
Total Disturbed Area:
44604
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
0
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
3434
SANITARY INFORMATION
Sanitary Type of Work:
None