PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
552596
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/01/2018
Permit Issued Date:
05/23/2019
Inspections Completed Date:
11/04/2020
Permit Remarks:
8/31/2020 SLB CHANGED ADDRESS FRON 9217 TO 9219 LINDEN AVE N
CONSTRUCTION VALUATION INFO
Intake Value: New:
552596
Intake Value: Alteration:
0
Total Intake Value:
552596
Issue Value: New:
1163046
Issue Value: Alteration:
0
Total Issued Value:
1163046
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
TRAO License Issued
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Pasture and Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
7006
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
4229
Total Volume Managed by On-Site Stormwater Management (gallons):
72306
Total Area Requiring Soil Amendment:
2777
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
8
Reuse Existing Side Sewer System:
No