PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
385877
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
08/16/2018
Permit Issued Date:
03/26/2019
Inspections Completed Date:
07/27/2020
Permit Remarks:
One 25' (BM 30) Non-exceptional tree located in north property for TP and TPA sign.
CONSTRUCTION VALUATION INFO
Intake Value: New:
385877
Intake Value: Alteration:
0
Total Intake Value:
385877
Issue Value: New:
297067.45
Issue Value: Alteration:
0
Total Issued Value:
297067.45
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
Applicant is proposing to use an existing alley located on the west of subject property.
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
6653672
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Formerly Combined
Total Disturbed Area:
4462
New Impervious Surface:
845
New Plus Replaced Impervious Surface:
1429
Total Volume Managed by On-Site Stormwater Management (gallons):
16439
Total Area Requiring Soil Amendment:
1321
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
Yes
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
SANITARY INFORMATION
Number of New Dwelling Units:
1