PERMIT APPLICATION COMMON
Where on your property are you working?:
EAST BLDG-7/26/18:A.M.:CHANGED ADDRESS FROM 3309 18TH AVE S TO 3311 18TH AVE S
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
384018
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/10/2018
Permit Issued Date:
05/21/2019
Inspections Completed Date:
01/13/2021
Certificate of Occupancy Issued Date:
01/14/2021
Permit Remarks:
2-unit live/work to be classified as R-3, no C of O required
CONSTRUCTION VALUATION INFO
Intake Value: New:
384018
Intake Value: Alteration:
0
Total Intake Value:
384018
Issue Value: New:
384018
Issue Value: Alteration:
0
Total Issued Value:
384018
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units Unoccupied
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
2067
New Impervious Surface:
709
New Plus Replaced Impervious Surface:
1559
Total Volume Managed by On-Site Stormwater Management (gallons):
9237
Total Area Requiring Soil Amendment:
508
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Dwelling Units:
3
Reuse Existing Side Sewer System:
No
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1