PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
300000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
09/04/2018
Permit Issued Date:
03/18/2020
Inspections Completed Date:
11/16/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
620038
Intake Value: Alteration:
0
Total Intake Value:
620038
Issue Value: New:
339550
Issue Value: Alteration:
0
Total Issued Value:
339550
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
More than 1 cubic yard
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
One standard residential curbcut 10 feet wide, to be located along 39th Ave approx. 14' 10" north of south property line.
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
1
# of Proposed Offsite Parking:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
9146
New Impervious Surface:
718
New Plus Replaced Impervious Surface:
2090
Total Volume Managed by On-Site Stormwater Management (gallons):
18087
Total Area Requiring Soil Amendment:
3430
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes