PERMIT APPLICATION COMMON
Where on your property are you working?:
4/11/18:A.M: CHANGED ADDRESS FROM 4800 SAND POINT WAY NE TO 4500 40TH AVE NE FOR INPATIENT BED BLDG (FOREST 'A')
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
1352000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/12/2018
Permit Issued Date:
07/20/2018
Inspections Completed Date:
12/06/2018
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1352000
Total Intake Value:
1352000
Issue Value: New:
0
Issue Value: Alteration:
1352000
Total Issued Value:
1352000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Electric Resistance
SIDE SEWER INFORMATION
Related New Construction Project:
6645066
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
Basic Plus
Basic Plus Type:
Enhance
Discharge Point:
Storm System
Total Disturbed Area:
15840
New Impervious Surface:
6957
New Plus Replaced Impervious Surface:
11390
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
4450
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
Addition/Alteration
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes