PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
189527
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
02/07/2018
Permit Issued Date:
06/12/2018
Inspections Completed Date:
01/30/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
146382
Intake Value: Alteration:
43145
Total Intake Value:
189527
Issue Value: New:
146382
Issue Value: Alteration:
43145
Total Issued Value:
189527
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
Yes
Action Type:
New
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Unknown
Cooling Fuel Type Proposed: Residential:
Unknown
Special Requirements:
Energy Credits 1a, 3d, 5a, and 5b. Solar Ready Not Required roof less than 600 sf.
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
3601
New Impervious Surface:
1897
New Plus Replaced Impervious Surface:
2495
Total Volume Managed by On-Site Stormwater Management (gallons):
33611
Total Area Requiring Soil Amendment:
1106
SANITARY INFORMATION
Sanitary Type of Work:
New
Reuse Existing Side Sewer System:
Yes
BUILDING CODE INFO
Number of Proposed Building Stories:
3
Is this a high-rise?:
No
DRAINAGE INFORMATION
Number of Other New Drainage Connections:
1
SANITARY INFORMATION
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1