PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
4911793
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/24/2018
Permit Issued Date:
03/19/2019
Inspections Completed Date:
09/30/2020
Certificate of Occupancy Issued Date:
09/30/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
4911793
Intake Value: Alteration:
0
Total Intake Value:
4911793
Issue Value: New:
4911793
Issue Value: Alteration:
0
Total Issued Value:
4911793
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
No
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Total UA Alternative
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Special Requirements:
PV on roof
Power is Sub-Metered?:
Yes
SIDE SEWER INFORMATION
Related New Construction Project:
6636579
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
1
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
7207
New Impervious Surface:
290
New Plus Replaced Impervious Surface:
6541
Total Volume Managed by On-Site Stormwater Management (gallons):
52458
Total Area Requiring Soil Amendment:
666
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Reuse Existing Side Sewer System:
No